Featured Projects

  • Mike's Carwash main tower with brand
    Mike’s Carwash
    Creating an Appropriate Design template for complex design issues, systems integrations, and waste water reuse requirements.
  • SCPA Alumni Lofts Entrance
    Alumni Lofts
    Renovation of historic Cincinnati property Appropriately Designed and Engineered Early with MEP + Fire Safety.
  • Clermont County Library
    Clermont County Library is a new 35,680 SF single-story building that will help Inform, engage, and inspire the community.
  • Hotel Covington Hospitality Full Renovation Kentucky
    Hotel Covington
    A boutique hotel in the heart of Covington, Kentucky. Engineered early with design-build bridging documents and engineering narrative.
  • Bear Paddle Swim School exterior in retail development
    Bear Paddle Swim Club
    Entrusted with the brand experience at this indoor swimming facility with saltwater pool at a retail park.
  • GoCo Dunkin Donuts combined retail space
    GoCo Dunkin Donuts
    Appropriate Design succeeds at delivering branded, hybrid gas, c-store, fast food consumer experience.

Engineer Early; protect the aesthetic vision with Appropriate Design.

Engineer Early is the application of value engineering during the design phase of the project. It’s not the value of value engineering, it’s the timing. Engineering early keeps the design and aesthetic value in line with the architect’s vision, and keeps costs in line with the developer’s vision.

You’ll appreciate this difference. It’s your vision. On time. On budget.