Featured Projects

  • Mike's Carwash main tower with brand
    Mike’s Carwash
    Creating an Appropriate Design template for complex design issues, systems integrations, and waste water reuse requirements.
  • Hotel Covington Hospitality Full Renovation Kentucky
    Hotel Covington
    A boutique hotel in the heart of Covington, Kentucky. Engineered early with design-build bridging documents and engineering narrative.
  • Bear Paddle Swim School exterior in retail development
    Bear Paddle Swim Club
    Entrusted with the brand experience at this indoor swimming facility with saltwater pool at a retail park.
  • Findlay Market Development apartment living room
    Findlay Market Development
    Findlay Market/Over-the-Rhine neighborhood renovation of 11 buildings into mixed-use spaces.
  • Open floor plan of Broadway Square kitchen and living area
    Broadway Square
    Apartments and retail rejuvenating an urban neighborhood in Cincinnati. Historic, tax credits and LEED certified.
  • GoCo Dunkin Donuts combined retail space
    GoCo Dunkin Donuts
    Appropriate Design succeeds at delivering branded, hybrid gas, c-store, fast food consumer experience.

Engineer Early; protect the aesthetic vision with Appropriate Design.

Engineer Early is the application of value engineering during the design phase of the project. It’s not the value of value engineering, it’s the timing. Engineering early keeps the design and aesthetic value in line with the architect’s vision, and keeps costs in line with the developer’s vision.

You’ll appreciate this difference. It’s your vision. On time. On budget.